There will be a pentagon shaped skylight in the main dome.
After the crew finished hanging the
re-bar,
I finished with the electrical conduit and boxes.
The walls will have 6 inches of concrete here,
so I needed to
use extensions for the electric boxes.
My friend Rick was in town and stopped by to see the domes.
He helped me finish up with hanging the conduit.
They started spraying the concrete on November 8th 2004
It should take about 10 work days to spray all the
concrete on the inside of the domes.